Pular para o conteúdo

Assunto · Inglês

Questões de Interpretação de texto | Reading comprehension com gabarito

4.335 questões de Interpretação de texto | Reading comprehension, em Inglês, da área de Linguagens. Cada questão tem página própria, com enunciado completo, alternativas e gabarito.

  • 4.335 questões

Resultados: 4.335 questões

Página 193 de 217

  • Linguagens

    Inglês

         Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
         As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
        Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
        Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
       “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
         The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
         Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
         President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
        Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
         “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
         The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
         Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
        Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
         Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

    Adapted from www.nytimes.com/April 12, 2014.
    People supporting the government of President Dilma Rousseff argue that the spending of public money in infrastructure projects has contributed to
    Escolha uma alternativa para a questão e16cfb3b-bb
  • Linguagens

    Inglês

         Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
         As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
        Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
        Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
       “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
         The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
         Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
         President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
        Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
         “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
         The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
         Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
        Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
         Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

    Adapted from www.nytimes.com/April 12, 2014.
    For some economists, the wasteful spending in the troublesome projects throughout the country unveils, among other aspects, questions related to
    Escolha uma alternativa para a questão e1736178-bb
  • Linguagens

    Inglês

         Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
         As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
        Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
        Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
       “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
         The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
         Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
         President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
        Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
         “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
         The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
         Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
        Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
         Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

    Adapted from www.nytimes.com/April 12, 2014.
    The –ING words in “withering criticism”, “wasteful spending” and “daunting task” are, respectively,
    Escolha uma alternativa para a questão e177f497-bb
  • Linguagens

    Inglês

         Brazil plowed billions of dollars into building a railroad across arid backlands, only for the longdelayed project to fall prey to metal scavengers. Curvaceous new public buildings designed by the famed architect Oscar Niemeyer were abandoned right after being constructed. There was even an illfated U.F.O. museum built with federal funds. Its skeletal remains now sit like a lost ship among the weeds.
         As Brazil sprints to get ready for the World Cup in June, it has run up against a catalog of delays, some caused by deadly construction accidents at stadiums, and cost overruns. It is building bus and rail systems for spectators that will not be finished until long after the games are done. But the World Cup projects are just a part of a bigger national problem casting a pall over Brazil’s grand ambitions: an array of lavish projects conceived when economic growth was surging that now stand abandoned, stalled or wildly over budget. 
        Some economists say the troubled projects reveal a crippling bureaucracy, irresponsible allocation of resources and bastions of corruption.
        Huge street protests have been aimed at costly new stadiums being built in cities like Manaus and Brasília, whose paltry fan bases are almost sure to leave a sea of empty seats after the World Cup events are finished, adding to concerns that even more white elephants will emerge from the tournament. 
       “The fiascos are multiplying, revealing disarray that is regrettably systemic,” said Gil Castello Branco, director of Contas Abertas, a Brazilian watchdog group that scrutinizes public budgets. “We’re waking up to the reality that immense resources have been wasted on extravagant projects when our public schools are still a mess and raw sewage is still in our streets.” 
         The growing list of troubled development projects includes a $3.4 billion network of concrete canals in the drought-plagued hinterland of northeast Brazil — which was supposed to be finished in 2010 — as well as dozens of new wind farms idled by a lack of transmission lines and unfinished luxury hotels blighting Rio de Janeiro’s skyline.
         Economists surveyed by the nation’s central bank see Brazil’s economy growing just 1.63 percent this year, down from 7.5 percent in 2010, making 2014 the fourth straight year of slow growth. 
         President Dilma Rousseff’s supporters contend that the public spending has worked, helping to keep unemployment at historical lows and preventing what would have been a much worse economic slowdown had the government not pumped its considerable resources into infrastructure development.
        Still, a growing chorus of critics argues that the inability to finish big infrastructure projects reveals weaknesses in Brazil’s model of state capitalism. First, they say, Brazil gives extraordinary influence to a web of state-controlled companies, banks and pension funds to invest in ill-advised projects. Then other bastions of the vast public bureaucracy cripple projects with audits and lawsuits.
         “Some ventures never deserved public money in the first place,” said Sérgio Lazzarini, an economist at Insper, a São Paulo business school, pointing to the millions in state financing for the overhaul of the Glória hotel in Rio, owned until recently by a mining tycoon, Eike Batista. The project was left unfinished, unable to open for the World Cup, when Mr. Batista’s business empire crumbled last year. “For infrastructure projects which deserve state support and get it,” Mr. Lazzarini continued, “there’s the daunting task of dealing with the risks that the state itself creates.” 
         The Transnordestina, a railroad begun in 2006 here in northeast Brazil, illustrates some of the pitfalls plaguing projects big and small. Scheduled to be finished in 2010 at a cost of about $1.8 billion, the railroad, designed to stretch more than 1,000 miles, is now expected to cost at least $3.2 billion, with most financing from state banks. Officials say it should be completed around 2016. But with work sites abandoned because of audits and other setbacks months ago in and around Paulistana, a town in Piauí, one of Brazil’s poorest states, even that timeline seems optimistic. Long stretches where freight trains were already supposed to be running stand deserted. Wiry vaqueiros, or cowboys, herd cattle in the shadow of ghostly railroad bridges that tower 150 feet above parched valleys. “Thieves are pillaging metal from the work sites,” said Adailton Vieira da Silva, 42, an electrician who labored with thousands of others before work halted last year. “Now there are just these bridges left in the middle of nowhere.” 
         Brazil’s transportation minister, César Borges, expressed exasperation with the delays in finishing the railroad, which is needed to transport soybean harvests to port. He listed the bureaucracies that delay projects like the Transnordestina: the Federal Court of Accounts; the Office of the Comptroller General; an environmental protection agency; an institute protecting archaeological patrimony; agencies protecting the rights of indigenous peoples and descendants of escaped slaves; and the Public Ministry, a body of independent prosecutors. Still, Mr. Borges insisted, “Projects get delayed in countries around the world, not just Brazil.”
        Some economists contend that the way Brazil is investing may be hampering growth instead of supporting it. The authorities encouraged energy companies to build wind farms, but dozens cannot operate because they lack transmission lines to connect to the electricity grid. Meanwhile, manufacturers worry over potential electricity rationing as reservoirs at hydroelectric dams run dry amid a drought.
         Then there is the extraterrestrial museum in Varginha, a city in southeast Brazil where residents claimed to have seen an alien in 1996. Officials secured federal money to build the museum, but now all that remains of the unfinished project is the rusting carcass of what looks like a flying saucer. “That museum,” said Roberto Macedo, an economist at the University of São Paulo, “is an insult to both extraterrestrials and the terrestrial beings like ourselves who foot the bill for yet another project failing to deliver.”

    Adapted from www.nytimes.com/April 12, 2014.
    In the sentence “That museum… is an insult to both extraterrestrials and the terrestrial beings like ourselves…”, one finds a/an
    Escolha uma alternativa para a questão e19eaf6b-bb
  • Linguagens

    Inglês

    When Garfield says “could’ve used a little salt”, what is he expressing?

    Imagem da questão de Inglês, PUC - PR 2015, Interpretação de texto | Reading comprehension

    Escolha uma alternativa para a questão e2286aed-30
  • Linguagens

    Inglês

    India Cheating Scandal: 600 Students Expelled at Bihar Schools

    More than 600 students have been expelled from school in India amid widespread cheating — with some having friends scale the walls of exam centers to pass notes through windows, officials said Friday. The students were among more than 1.4 million high school students taking their 10th grade school finals in the eastern state of Bihar. Many of those caught cheating had smuggled textbooks or scraps of paper to be used for cheating, police and education officials said. Friends, parents and other relatives of the teenagers were seen climbing the sides of some exam centers on Wednesday and Thursday as they tried to reach the windows of the classrooms where the students were taking their exams. They appeared to be trying to pass on cheat sheets with answers written on them. Bihar's education minister, P K Shahi, said the scale of the cheating made it impossible for officials alone to contain and that families should help.

    Disponível em:: <http://www.nbcnews.com/news/world/six-hundred-students-caught-cheating-bihar-india-schools-n327066> . Acesso em: abril de 2015.

    According to the text, choose the alternative which shows the CORRECT sequence of T (true) or F (false).

    I. 600 students quit school.

    II. Families tried to help the students to cheat.

    III. In the education minister’s perspective, it turned out to be ok the families’ help.

    IV. At least 1.4 million students were taking the test.

    V. They took this test because they did not have good grades during the semester.

    Escolha uma alternativa para a questão e22b41c8-30
  • Linguagens

    Inglês

    Opera

    Opera refers to a dramatic art form, originating in Europe, in which the emotional content is conveyed to the audience as much through music, both vocal and instrumental, as it is through the lyrics. By contrast, in musical theater an actor's dramatic performance is primary, and the music plays a lesser role. The drama in opera is presented using the primary elements of theater such as scenery, costumes, and acting. However, the words of the opera, or libretto, are sung rather than spoken. The singers are accompanied by a musical ensemble ranging from a small instrumental ensemble to a full symphonic orchestra.

    Disponível em: <http://www.grammarbank.com/short-reading-comprehension-passages.html> . Acesso em: novembro 2014.

    Select the alternative that is TRUE, according to the text.

    Escolha uma alternativa para a questão e237d48f-30
  • Linguagens

    Inglês

    Imagem da questão de Inglês, PUC - RS 2010, Interpretação de texto | Reading comprehension From the information in the text, one learns that the Victorian period in England:

    Escolha uma alternativa para a questão e2967830-28
  • Linguagens

    Inglês

    Figura 1 de 3 da questão de Inglês, IF-BA 2014, Interpretação de texto | Reading comprehension
    Figura 2 de 3 da questão de Inglês, IF-BA 2014, Interpretação de texto | Reading comprehension
    Figura 3 de 3 da questão de Inglês, IF-BA 2014, Interpretação de texto | Reading comprehension
    According to the text, it's correct to say that:
    Escolha uma alternativa para a questão e2b2d676-e6
  • Linguagens

    Inglês

    Imagem da questão de Inglês, UNEMAT 2010, Interpretação de texto | Reading comprehension

    Fonte:

    http://www.cnn.com/2010/WORLD/asiapcf/10/18/china.m

    iners/index.html?iref=allsearch (Acessado e adaptado

    em 08/10/10) 

    Analise as assertivas abaixo.


    I. A explosão ocorreu em uma mina de carvão localizada na província de Henan, próxima à cidade de Xinhua.

    II. A palavra pit (ℓ. 8) refere-se à mina que explodiu.

    III. Du Bo é um deputado chinês empenhado na operação para salvar os mineiros.

    IV. A palavra workers (ℓ. 3 e 14) refere-se aos mineiros.

    V. É a segunda vez que ocorrem acidentes com explosão na mesma mina e com vítimas fatais.


    Assinale a alternativa correta.

    Escolha uma alternativa para a questão e2b9049c-af
  • Linguagens

    Inglês

    Imagem da questão de Inglês, UNEMAT 2010, Interpretação de texto | Reading comprehension

    Fonte:

    http://www.cnn.com/2010/WORLD/asiapcf/10/18/china.m

    iners/index.html?iref=allsearch (Acessado e adaptado

    em 08/10/10) 

    Assinale a alternativa correta.
    Escolha uma alternativa para a questão e2bc51cb-af
  • Linguagens

    Inglês

    Figura 1 de 3 da questão de Inglês, IF-BA 2014, Interpretação de texto | Reading comprehension
    Figura 2 de 3 da questão de Inglês, IF-BA 2014, Interpretação de texto | Reading comprehension
    Figura 3 de 3 da questão de Inglês, IF-BA 2014, Interpretação de texto | Reading comprehension
    Consider the sentences given and mark the correct option, according to the text:


    I. Children educators firstly noticed how text-tospeech softwares could benefit English Learners;

    II. The introduction of personal computers in our society is considered a landmark for the use of technology in education;

    III. Virtual teacher-student communication is not effective since it relies on the use of the Internet.
    Escolha uma alternativa para a questão e2bd4928-e6
  • Linguagens

    Inglês

    Figura 1 de 3 da questão de Inglês, IF-BA 2014, Aspectos linguísticos | Linguistic aspects
    Figura 2 de 3 da questão de Inglês, IF-BA 2014, Aspectos linguísticos | Linguistic aspects
    Figura 3 de 3 da questão de Inglês, IF-BA 2014, Aspectos linguísticos | Linguistic aspects
    All these sentences represent an action that is still in progress, EXCEPT:
    Escolha uma alternativa para a questão e2c1e27a-e6
  • Linguagens

    Inglês

    Figura 1 de 3 da questão de Inglês, IF-BA 2014, Interpretação de texto | Reading comprehension
    Figura 2 de 3 da questão de Inglês, IF-BA 2014, Interpretação de texto | Reading comprehension
    Figura 3 de 3 da questão de Inglês, IF-BA 2014, Interpretação de texto | Reading comprehension
    According to the text, it's correct to say that:
    Escolha uma alternativa para a questão e2ca479f-e6
  • Linguagens

    Inglês

    Figura 1 de 3 da questão de Inglês, IF-BA 2014, Interpretação de texto | Reading comprehension
    Figura 2 de 3 da questão de Inglês, IF-BA 2014, Interpretação de texto | Reading comprehension
    Figura 3 de 3 da questão de Inglês, IF-BA 2014, Interpretação de texto | Reading comprehension
    Consider the statements given and mark the correct option, according to their grammar features:


    I. In the sentence “President Lula took part in a ceremony that focused firmly on the future” the relative pronoun that can be replaced by which without changing the meaning of the sentence.

    II. In the sentence “We have a chip, we have a level that can be used on frontier control, we can guarantee citizenship, and it can guarantee transactions in the virtual world” the modal verb can indicates an ability.

    III. The word currently in the sentence “Currently, Brazilians have to deal with a confusing array of identity numbers” can be substituted by the word nowadays without changing the meaning of the sentence.
    Escolha uma alternativa para a questão e2cddab0-e6
  • Linguagens

    Inglês

    Imagem da questão de Inglês, UNIFESP 2012, Interpretação de texto | Reading comprehension

    The answer to the first question points out that

    Escolha uma alternativa para a questão e2fa86ec-fe
  • Linguagens

    Inglês

    Elderly flight passenger throws coins into engine for ‘luck’, delays take-off for hours


    China Southern Airlines Flight 380 was held up at the Shanghai Pudong International Airport after an elderly woman passenger caused a disruption, according to the airline’s official WeChat account. An investigation into the incident is under way.

    Passengers boarding the flight reportedly saw an elderly woman throwing coins at the engine for “blessings” from the middle of the boarding staircase and alerted the crew.

    Ground staff said the woman, who appeared to be about 80 and had limited mobility, was accompanied by her husband, daughter and son-in-law. 

    The captain was quoted as saying the metal, if sucked up by the engine, could have caused serious damage, including failure. 

    The flight was later given a green light and took off at 5.52pm, more than five hours late. It is scheduled to arrive in Guangzhou at 8.14pm. 

    (Adaptado de Sarah Zheng, Elderly flight passenger throws coins into engine for ‘luck’, delays take-off for hours. South China Morning Post, 27/06/2017. Disponível em http://www.scmp.com/news/china/society/article/2100242/elderlyflight-passenger-throws-coins-engine-luck-delays-take. Acessado em 10/07/2017.)

    O que é correto afirmar sobre o incidente relatado na notícia anterior? 

    Escolha uma alternativa para a questão e31f88ba-38
  • Linguagens

    Inglês

    Imagem da questão de Inglês, UNICAMP 2017, Interpretação de texto | Reading comprehension

    Os panfletos acima foram distribuídos na entrada de uma assembleia de estudantes universitários, reunidos para discutir um pedido de reforma nos banheiros do campus. Assinale a opção correta. 

    Escolha uma alternativa para a questão e322b930-38
  • Linguagens

    Inglês

    ZOMBIE NEUROSCIENCE

    I don’t know if cockroaches dream, but I imagine if they do, jewel wasps feature prominently in their nightmares. These small, solitary tropical wasps are of little concern to us humans; after all, they don’t manipulate our minds so that they can serve us up as willing, living meals to their newborns, as they do to unsuspecting cockroaches. The story is simple, if grotesque: the female wasp controls the minds of the cockroaches she feeds to her offspring, taking away their sense of fear or will to escape their fate. What turns a once healthy cockroach into a mindless zombie it’s venom. Not just any venom, either: a specific venom that acts like a drug, targeting the cockroach's brain.

    (Adaptado de Christie Wilcox, Zombie Neuroscience. Scientific American, New York, v. 315, n. 2, p. 70–73, 2016.)

    De acordo com o autor,

    Escolha uma alternativa para a questão e325f754-38